26 — PiPe Trades Pro
calcUlaTE coSTS
The Cost function provides the total cost for material, based on
a stored unit cost and an entered quantity of material. This is
convenient for quickly calculating costs on a job that requires
many of the same kind of items.
Example: You are doing an installation that includes 120 feet of
pipe that comes in 10' lengths at $3.21 per 10' pipe.
KEYSTROKE DISPLAY
Store the unit cost of the pipes needed:
0.
COST PER 3.21
Enter the number required:
12
Calculate total cost:
(Cost) TTL$ 38.
52
You can then quickly calculate costs for a different number of
the same item.
KEYSTROKE DISPLAY
0.
7 17
(Cost) TTL$ 54.
57
You can also nd costs of different items on the y without
overwriting your stored unit cost.
Determine the cost of 17 fittings at $2.89 each:
KEYSTROKE DISPLAY
Enter number of pipes needed:
0.
7 17
Multiply by the cost:
2.89
(Cost) TTL$ 49.
13